Advertise with The Record Reporter
Advertise with The Record Reporter

Work Progresses on Highway 95, No Change to Expected Completion Date

By
Linda Prier
,
Council Correspondent
By
Printed in our
April 16, 2025
issue.

The Meadows Valley Gold Line Shuttle between New Meadows and the north end of the construction closure at milepost 146.8 is now operational. According to New Meadows City Hall, Mayor Julie Good worked hard to make this happen for people who must commute between the City of New Meadows and Council on Highway 95, which will be closed for the next month. The shuttle operates on weekdays only and, right now, there is no equivalent operation for southbound travelers headed into Council.

A shuttle will pick people up from the north side of the closure and bring them to Tamarack Mill or in to New Meadows. Image from treasurevalleytransit.com/wp-content/uploads/2025/04/US95-Shuttle-PDF.pdf
Braun-Jensen is drilling holes 45’ into the ground and setting large h-pile into the holes and placing concrete around the steel pile. Wood lagging will then be installed between the pile. Picture was taken April 8.
Aerial image of the repair work on US-95. Picture taken on April 9th. Photo credit: Dale Fisk.
The Record Reporter logo showing an old typewriter behind the text 'The Record Reporter'
Contact Us